Municipality licensed

Termite control in Dubai

Soil barriers, injection treatment and pre-construction protection. Free inspection, fixed written quote, warranty in writing.

Anti-termite soil treatment being injected around a building foundation in Dubai

Free inspection and written quote

Warranty period stated in writing

Treatment records for developers

Ministry-registered products

Choose your termite service

Anti-termite treatment splits three ways in Dubai, and whether the building already exists or is still being poured changes the entire method. Start with an inspection if you are not sure which applies.

  • Pre-construction anti-termite barrier being applied to prepared ground before a slab pour

    Pre-Construction Anti Termite

    Chemical soil barrier applied in stages before and during the pour, under the slab, around the perimeter and at every service penetration. Treatment records issued for the project file.

    Pre-construction treatment
  • Technician injecting termiticide into a drilled perimeter hole at a Dubai villa

    Post-Construction Anti Termite

    For buildings already standing. Drilling and injection along the perimeter, at expansion joints and service entries, plus direct treatment of infested timber.

    Post-construction treatment
  • Termite inspection of timber and wall base during a property survey

    Termite Inspection

    A survey of timber, joinery, wall bases and service penetrations to confirm whether termites are active, what species, and how far the damage extends. Written report either way.

    Book an inspection

Not sure what you are dealing with?

Send a photo on WhatsApp. We identify the species before the visit, so the technician arrives with the right treatment in the van.

Send a photo

How termite treatment actually works

Termites are reached through the soil and the timber, not through the air. These are the methods and when each applies.

  1. 01Pre-pour soil treatmentTermiticide applied to prepared ground before the slab is cast, creating a continuous treated zone under the building. The only opportunity to protect the whole footprint at once.
  2. 02Perimeter drilling and injectionFor existing buildings. Holes drilled at intervals along the perimeter and internal wall bases, termiticide injected under pressure, then the holes sealed and made good.
  3. 03Service penetration treatmentPlumbing, drainage and cable entries are the most common route into a finished building. Each penetration is treated individually, since the perimeter alone leaves them open.
  4. 04Direct timber treatmentInfested joinery, door frames, skirting and built-in furniture treated directly, and mud tubes removed so recolonisation is visible if it happens.
  5. 05Monitoring and follow-upA scheduled recheck of the treated zone and the timber, which turns a treatment into a warranty you can actually rely on.

What happens

From your first message to the follow-up visit

  1. 01You get in touchCall, WhatsApp or the form. Answered Sat–Thu, 08:00–18:00.
  2. 02Free inspectionSpecies, breeding areas, entry points and severity, recorded on site.
  3. 03Written quoteFixed price, the method we will use, and what you need to do beforehand.
  4. 04TreatmentUniformed technicians, registered products, minimal disruption.
  5. 05Follow-upScheduled recheck, and free re-treatment if anything returns inside the warranty.

Who we work for

Technician treating the perimeter of a Dubai villa for termites

Termite treatment for homes

Villas, townhouses and ground-floor apartments. Soil injection around the perimeter and treatment of affected joinery, with the warranty period stated on the quote.

Residential pest control
Anti-termite treatment being carried out on a Dubai construction site

Termite protection for developers

Pre-construction barriers applied in stages against the build programme, with treatment records issued for each stage for the project file and handover pack.

Construction site services

Termite control questions

How do I know if I have termites and not ants?

Termites have straight antennae, a thick waist and two pairs of equal-length wings; flying ants have elbowed antennae, a pinched waist and unequal wings. Mud tubes on walls and hollow-sounding timber point to termites, not ants.

Do I need to leave the property during treatment?

For post-construction soil injection and localised timber treatment, no. We confirm the re-entry time when the work is booked if any part of it requires one.

How long does an anti-termite treatment last?

A correctly applied soil barrier lasts for years, and the warranty period is stated in writing on your quote. The period varies with the method and the substrate, which is why it is quoted after the inspection.

Can termites damage a concrete building?

They do not eat concrete, but they enter through expansion joints, service penetrations and cracks to reach door frames, skirting, cupboards, wardrobes and stored paper. Concrete construction is not protection on its own.

Do you provide documentation for developers?

Yes. Pre-construction soil treatment is carried out in stages against the build programme, with treatment records issued for each stage for your project file and handover documentation.

Book a free inspection today

Tell us what you need and where. Most of Dubai can be covered the same day.

CallWhatsAppFree quote